![](https://urbaarchitects.eu/wp-content/uploads/2015/03/poprawka-1-987x411.jpg)
![](https://urbaarchitects.eu/wp-content/uploads/2015/03/ujecie-2-bez-drzew-w-tle-986x411.jpg)
![](https://urbaarchitects.eu/wp-content/uploads/2015/03/ujecie-33-poprawione-1-1028x411.jpg)
![](https://urbaarchitects.eu/wp-content/uploads/2015/03/ujęcie-4-1028x411.jpg)
![](https://urbaarchitects.eu/wp-content/uploads/2015/03/ujęcie-5-1028x411.jpg)
![](https://urbaarchitects.eu/wp-content/uploads/2015/03/ujęcie-front-2-978x411.jpg)
![](https://urbaarchitects.eu/wp-content/uploads/2015/03/01fin_jpg-548x411.jpg)
![](https://urbaarchitects.eu/wp-content/uploads/2015/03/05fin_JPG_-548x411.jpg)
Suflidowo
12 Teresin, Drużbice, Bełchatów County
The project has involved the reconstruction and expansion of an egg production plant to include modern packing hall, food-processing facilities, laboratories, warehouses, cold stores and two-storey office space. A distinctive office building significantly raised the standard of work at the existing plant.
Project: 2010
Completion date: 2012-2014
Area: 3.500m2
Client: F.H.U. Suflidowo
Range of services:
Architectural concept design
Building permit design
Construction design
Project team:
Anna Komorowska
Maciej Kronenberg
Piotr Knez
In cooperation with:
structural engineering – Biuro Konstrukcyjne Łukasz Zatorowski i Piotr Wolarek
mechanical engineering (HVAC) – Introinstal
sanitary engineering (water and waste) – Bartłomiej Rossa
electrical engineering – Andrzej Nowak
roads & traffic engineering – Albin Chomicki